China officially targets 2020 Solar CSP 5GW allocation, 11.5centskWh cost
2016.12.20 From: CSP Focus
China National Energy Administration (NEA) formally issued “the 13th Five-year (2016-2020) Plan for Solar Energy Development” this Dec.16th, allocating 110GW solar power capacity, of which 5GW is targeted on concentrated solar power (CSP), and 105GW on PV.
The Plan indicates great importance on the development of CSP despite its relatively smaller share. As an emerging solar power, CSP is playing a greater role on China power layout. As CSP Focus keeps reporting, the 1st Phase 20 CSP pilot projects (1.349GW) are already or will be soon constructed, all the participators are trying best to make the projects finished by the end of 2018 so as to enjoy the pilot FiT of RMB 1.15/kWh (around USD 16.55 cents). On theCSP cost, the Plan targets RMB 0.8/kWh (around USD 11.51 cents) by 2020.
Freereport: List of China 1st Phase 20 CSP Pilot Projects
As the Plans says on the key tasks of CSP during 2016-2020, “the government should actively promote the construction of the 1st phase of 20 pilot projects (1.349GW), from which the industry could get experience on construction and operation, test the reliability of components and help to perfect political environment and regulations. As a result, the realization of industrialization and producthigh-quality contributes to lowering cost and strengthening competiveness.” The success of 1stPhase projects are quite crucial to the overall 5GW allocation of 13th FYP.
More from CSP Focus
NextLeave your thoughts here
Reports(Member Only)
See more+-
CSP Focus Membership Proposals
We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea
-
The Latest CSP Focus Monthly Update
Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.
-
CSP Project Monthly Update 2022 December Edition
CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.
-
Presentations-CSP Focus China 2021
The Report is for CSP Focus Members only.
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China
Project Updates
See more+-
Lanzhou Dacheng Dunhuang CSP Project
Asia Pacific-China,Operational,Parabolic Trough
-
Luneng Haixi 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower
-
Dubai 950MW NOOR Energy 1 CSP+PV Project
MENA-UAE,Under construction,Power Tower
-
Power China Gonghe 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower