Free to speak! Applications are open for CSP Focus Innovation China Oct.25-26

2018.07.12     From: CSP Focus


Speaker Application Form-CSP Focus Innovation 2018 Oct.25-26 China.docx



Currently, China 1st batch of pilot projects are still moving forward, the industry is stepping into a new phase.


At this crucial moment, it is of great importance that we need tolook back to origin:


  • Summarize global CSP technical breakthroughs and CSP’s future development trend and innovation direction.

  • Understand combination of practical projects and innovative engineering, commercial references/prospects of cutting-edge technology and equipment.

  • Pave the way for CSP’s further growth.


Are you weary of conferences filled with repetitive project process introduction and advertising?


As the most professional, international, influential consultancy in CSP industry, CSP Focus will hold 2018 CSP Focus Innovation event in Shanghai/Xi’an on Oct.25-26.


For the sake of bringing fruitful and valuable contents to all participants, now speaker slots are open for recruitment to all players! If the presentation fits the theme of sessions, and content must be informative which could bring substantial value to audience, then whether design institutes, developers, EPCs, or consultancies, key suppliers…etc. are able to get free speaker slots.


If your presentation is interesting, novel, relating to practical project experience, please do not hesitate to contact us!


Click the link on top and download the application form, you will be easier to be selected as a speaker if submit earlier.


Brief agenda could be seen as below (☆ refers to the key issues):

               

 

DAY1 

A.M

 

CSP Engineering  Experience & Innovation-Driven Development

☆ Engineering related experience from successful projects (Consulting, Design, Management, Execution).

    Global cooperation and cost reduction of CSP projects.

☆ Future development trend of global state-of-the-art technology and engineering.

 

DAY1 

P.M

 

CSP Plant  Commissioning and O&M Experience Sharing and Cutting-edge Technology

☆ Key issues and experience sharing of plant commissioning.

    QSE system and experience sharing.

☆ New mode to reduce O&M cost.

☆ Diversified CSP applications.

……

 

DAY2

 A.M

 

Stream A: System  Integration, Optimization and Innovation of Solar Field in Solar Towe-r/Dish  Parabolic Plant

Stream B: System  Integration, Optimization and Innovation of Solar Field in Parabolic Trough  Pl-ant

☆ Tower design and modelling/Solar field layout

     New type of heliostat system.

☆ Control system and tracking system integratio-n optimization.

☆ Central receiver optimization trend

    The other relevant design or components upgrade in solar tower power plant.

☆ Commercialization of dish stirling+storage.

……

☆ Design optimization of heat transfer pipeline and s-olar field layout.

☆ Innovation and breakthrough of solar collector.

☆ Control system and tracking system integration opt-imization.

   The other relevant design or components upgrade in  parabolic trough power plant

    Innovative application of Linear Fresnel.

……

 

DAY2

 P.M

 

Stream C: System  Integration, Optimization and Innovation of Heat Transfer System & T-ES

Stream D: System  Integration, Optimization and Innovation of Power Block

☆ Design experience and technology breakthro-ughs of key components in TES.

☆ TES system engineering and optimization.

☆ Novel HTF & thermal storage medium and the-ir commercial prospects.

……

☆ Cooling system engineering and optimization.

☆ Steam generation system engineering and optimiz-ation.

    Steam turbine system engineering and optimizatio-n.

    Technical selection of key auxiliary equipment.

☆ Standard for CSP grid-connection

……


For more details, please refer to official website,
http://china.cspfocus.cn/en/

Leave your thoughts here

Free Reports

See more+
  • Applicants in China 2nd Batch of CSP Demonstration Projects

    Sheet1: Projects Applying for China 2nd Batch of CSP DemonstrationsSheet2: Projects Located in Hami Applying for China 2nd Batch of CSP Demonstrations

  • CONCENTRATED SOLAR POWER IN THE MENA REGION

    1. CONCENTRATED SOLAR POWERIN THE MENA REGION 1.1 An introduction to ConcentratedSolar Power (CSP)2. HOW IT WORKS?3. CSP PROJECTSIN THE MENA REGION 3.1 Shams 1 Project 3.2 Noor Ouarzazate & Noor Midelt4. CHALLENGES TO DEPLOYMENT 4.1 Project Costs and Supply Chain 4.2 Lack of Funding to Support R&D 4.3 Financing and Project Risk5. HOW TO OVERCOME THESE CHALLENGES?6. WHAT DOES THEFUTUR

  • Abengoa CSP Technology Experience in China Market

    1. Introduction: Abengoa at a glance2. STE Abengoa References: Main Achievements3. CSP LCOE Evolution: STE LCOE Evolution main relevant countries4. EPC cost in a STE power plant 4.1 Tower technology 4.2 Parabolic trough technology5. Specific cases and scheme for Abengoa in China 5.1 Haixi Luneng Molten Salts Tower Technology 50 MWe, Qinghai 5.2 Yumen East Town Parabolic Trough Technology 50 MW

  • Power Output Reduction Caused by Equipment Accidents —Supcon 10MW&50MW CSP Tower Plant Case Study

    ● Analysis of impacts on LCOE for STE plants ● Analysis of impact factors on production of SUPCON Delingha 10MW plant ● Plan and progress of SUPCON 50MW CSP demonstration project

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news