Currently, China 1st batch of pilot projects are still moving forward, the industry is stepping into a new phase.


At this crucial moment, it is of great importance that we need tolook back to origin:


  • Summarize global CSP technical breakthroughs and CSP’s future development trend and innovation direction.

  • Understand combination of practical projects and innovative engineering, commercial references/prospects of cutting-edge technology and equipment.

  • Pave the way for CSP’s further growth.


Are you weary of conferences filled with repetitive project process introduction and advertising?


As the most professional, international, influential consultancy in CSP industry, CSP Focus will hold 2018 CSP Focus Innovation event in Shanghai/Xi’an on Oct.25-26.


For the sake of bringing fruitful and valuable contents to all participants, now speaker slots are open for recruitment to all players! If the presentation fits the theme of sessions, and content must be informative which could bring substantial value to audience, then whether design institutes, developers, EPCs, or consultancies, key suppliers…etc. are able to get free speaker slots.


If your presentation is interesting, novel, relating to practical project experience, please do not hesitate to contact us!


Click the link on top and download the application form, you will be easier to be selected as a speaker if submit earlier.


Brief agenda could be seen as below (☆ refers to the key issues):

               

 

DAY1 

A.M

 

CSP Engineering  Experience & Innovation-Driven Development

☆ Engineering related experience from successful projects (Consulting, Design, Management, Execution).

    Global cooperation and cost reduction of CSP projects.

☆ Future development trend of global state-of-the-art technology and engineering.

 

DAY1 

P.M

 

CSP Plant  Commissioning and O&M Experience Sharing and Cutting-edge Technology

☆ Key issues and experience sharing of plant commissioning.

    QSE system and experience sharing.

☆ New mode to reduce O&M cost.

☆ Diversified CSP applications.

……

 

DAY2

 A.M

 

Stream A: System  Integration, Optimization and Innovation of Solar Field in Solar Towe-r/Dish  Parabolic Plant

Stream B: System  Integration, Optimization and Innovation of Solar Field in Parabolic Trough  Pl-ant

☆ Tower design and modelling/Solar field layout

     New type of heliostat system.

☆ Control system and tracking system integratio-n optimization.

☆ Central receiver optimization trend

    The other relevant design or components upgrade in solar tower power plant.

☆ Commercialization of dish stirling+storage.

……

☆ Design optimization of heat transfer pipeline and s-olar field layout.

☆ Innovation and breakthrough of solar collector.

☆ Control system and tracking system integration opt-imization.

   The other relevant design or components upgrade in  parabolic trough power plant

    Innovative application of Linear Fresnel.

……

 

DAY2

 P.M

 

Stream C: System  Integration, Optimization and Innovation of Heat Transfer System & T-ES

Stream D: System  Integration, Optimization and Innovation of Power Block

☆ Design experience and technology breakthro-ughs of key components in TES.

☆ TES system engineering and optimization.

☆ Novel HTF & thermal storage medium and the-ir commercial prospects.

……

☆ Cooling system engineering and optimization.

☆ Steam generation system engineering and optimiz-ation.

    Steam turbine system engineering and optimizatio-n.

    Technical selection of key auxiliary equipment.

☆ Standard for CSP grid-connection

……


For more details, please refer to official website,
http://china.cspfocus.cn/en/

Leave your thoughts here

Free Reports

See more+
  • CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project

    Updating--Feb., 2019 Edition8 pages in totalAs one of the first batch of 20 pilot CSPprojects, CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project is thelargest trough plant within the pilot projects, in terms of installed capacity.1. Overview (P2)2. Fast sheet (P2-3)3. Highlights (P3)4. Project Milestones (P4)5. Project Participants 5.1. Developer--Inner Mongolia China Nuclear Royal Tech C

  • Applicants in China 2nd Batch of CSP Demonstration Projects

    Updating--Feb., 2019 Edition11 pages in total1.Projects with feasibility study meeting finished (P1-3)These 24 projects with total capacity of 3,050 MW have been progressed faster with the feasibility study finished during in the past three years, and they are expected to be included in the 2nd batch of China CSP demonstration projects in the future.2.Projects Applying for China 2nd Batch of CSP D

  • Power China Gonghe 50MW Molten Salt Tower CSP Project

    Updating--Feb., 2019 Edition8 pages in totalLocatedin Hainan Eco Solar Energy Park, 12 kilometers southwest to Gonghe County ofQinghai Province, Power China Gonghe 50MW Molten Salt Tower CSP Project isselected as one of the first batch of pilot CSP projects in China. 1. Overview (P2)2. Fast sheet (P2-3)3. Project Milestones (P4)4. Project Participants 4.1. Developer (P5) 4.2. Owner&Inves

  • Introduction of Dubai 950MW CSP+PV Project by Shanghai Electric

    OverviewLayoutWorld largest investment on single IPP CSP projectWorld largest capacity of singleCSP+PV projectWorld largest area of singleCSP+PV projectWorld biggest quantity of molten salt used in single CSP projectAdvanced technology—World tallest CSP towerWorld leading tower wireless heliostat technologyWorld largest trough in commercial CSP projectMost competitive price—USD 7.3cents/kWhContr

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news