Currently, China 1st batch of pilot projects are still moving forward, the industry is stepping into a new phase.


At this crucial moment, it is of great importance that we need tolook back to origin:


  • Summarize global CSP technical breakthroughs and CSP’s future development trend and innovation direction.

  • Understand combination of practical projects and innovative engineering, commercial references/prospects of cutting-edge technology and equipment.

  • Pave the way for CSP’s further growth.


Are you weary of conferences filled with repetitive project process introduction and advertising?


As the most professional, international, influential consultancy in CSP industry, CSP Focus will hold 2018 CSP Focus Innovation event in Shanghai/Xi’an on Oct.25-26.


For the sake of bringing fruitful and valuable contents to all participants, now speaker slots are open for recruitment to all players! If the presentation fits the theme of sessions, and content must be informative which could bring substantial value to audience, then whether design institutes, developers, EPCs, or consultancies, key suppliers…etc. are able to get free speaker slots.


If your presentation is interesting, novel, relating to practical project experience, please do not hesitate to contact us!


Click the link on top and download the application form, you will be easier to be selected as a speaker if submit earlier.


Brief agenda could be seen as below (☆ refers to the key issues):

               

 

DAY1 

A.M

 

CSP Engineering  Experience & Innovation-Driven Development

☆ Engineering related experience from successful projects (Consulting, Design, Management, Execution).

    Global cooperation and cost reduction of CSP projects.

☆ Future development trend of global state-of-the-art technology and engineering.

 

DAY1 

P.M

 

CSP Plant  Commissioning and O&M Experience Sharing and Cutting-edge Technology

☆ Key issues and experience sharing of plant commissioning.

    QSE system and experience sharing.

☆ New mode to reduce O&M cost.

☆ Diversified CSP applications.

……

 

DAY2

 A.M

 

Stream A: System  Integration, Optimization and Innovation of Solar Field in Solar Towe-r/Dish  Parabolic Plant

Stream B: System  Integration, Optimization and Innovation of Solar Field in Parabolic Trough  Pl-ant

☆ Tower design and modelling/Solar field layout

     New type of heliostat system.

☆ Control system and tracking system integratio-n optimization.

☆ Central receiver optimization trend

    The other relevant design or components upgrade in solar tower power plant.

☆ Commercialization of dish stirling+storage.

……

☆ Design optimization of heat transfer pipeline and s-olar field layout.

☆ Innovation and breakthrough of solar collector.

☆ Control system and tracking system integration opt-imization.

   The other relevant design or components upgrade in  parabolic trough power plant

    Innovative application of Linear Fresnel.

……

 

DAY2

 P.M

 

Stream C: System  Integration, Optimization and Innovation of Heat Transfer System & T-ES

Stream D: System  Integration, Optimization and Innovation of Power Block

☆ Design experience and technology breakthro-ughs of key components in TES.

☆ TES system engineering and optimization.

☆ Novel HTF & thermal storage medium and the-ir commercial prospects.

……

☆ Cooling system engineering and optimization.

☆ Steam generation system engineering and optimiz-ation.

    Steam turbine system engineering and optimizatio-n.

    Technical selection of key auxiliary equipment.

☆ Standard for CSP grid-connection

……


For more details, please refer to official website,
http://china.cspfocus.cn/en/

Leave your thoughts here

Free Reports

See more+
  • Progress of China 1st batch CSP demonstrations and suggestions to follow-up projects development

    Content1. Progress of first batch of CSP demonstrations 1.1 Approvedprojectsasdemonstrations 1.2 Implementation & adjustment 1.3 primary reasons for projects progress has been less than expected2. Development prospect of CSP in China 2.1 Objective of Energy Development 2.2 Power Development Prediction 2.3 the role of CSP plant in electric system 2.4 DNI resource in China

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

  • Yumen Xinneng 50MW Molten Salt Tower Beam-down CSP Project

    1. Project Overview 2. Technology & Design--Beam-down molten salt tower CSP technology 3. Project Owner & Investment 3.1 Project Owner 3.2 Investment 4. Project Development and Construction Progress 4.1 Project Schedule 4.2 Project Participants

  • CGN Delingha 50MW Parabolic Trough CSP Project

    Project Overview Technology & Design 2.1. Solar Field 2.2. HTF & TES 2.3. Power Block Project development and investment 3.1. Main Project Participants 3.2. CGN CSP Business and Projects Project development and progress Main Participants (Partial)

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news