中文  |  ENGLISH

Saudi Arabia’s first ISCC plant to set record low CSP cost

2016.02.23     From: CSPTODAY

Site activities are underway for the Duba 1 Integrated Solar Combined Cycle (ISCC) station which will host the largest integrated CSP capacity in the Arabian Gulf region.



Saudi Arabia’s first ISCC plant to set record low CSP cost

 

Image credit: Prognone


The 605 MW power plant will include a 43 MW parabolic trough array, around double the largest solar capacity on an ISCC in the Middle East and North Africa to date.


Algeria’s Hassi-R’mel plant integrates a 25 MW solar field while Egypt’s Kuraymat ISCC plant and Morocco’s Ain-Beni-Mathar station each comprise 20 MW CSP units.


“Duba’s CSP capacity is not a huge leap from existing ISCC plants. Once you’ve solved the complexities for 25 MW, you can overcome any difficulties in building a larger capacity,” Eng. Khaled Alrashed, president and CEO of project developments at Saudi Electricity Company (SEC) told CSP Today.


“The only initial constraint was the land. We needed a big area– around 1 square kilometer,” he added.


Economies of scale


The capital cost of the solar thermal facility is projected to be less than half the lowest CSP cost achieved up until now, due to the economies of scale associated with the large plant project.


“We got the cheapest CSP cost per installed kilowatt from Duba 1and Waad Al Shamal – less than $1,600/kW,” Alrashed said. The 1,390 MW Waad Al Shamal plant is set to follow on from the Duba 1 project and provide 50 MW of solar capacity.


The capital cost for standalone parabolic-trough plants without storage currently ranges from $3,500/kW to $8,000/kW, according to IRENA’s Renewable Energy Generation Costs 2014 report.


SEC, the owner and offtaker of the Duba 1 plant, awarded Spain’s Initec Energia a $663 million EPC contract for the project in November 2015. Local partner Saudi Services for Electro-Mechanic Works was also brought on board.


GE will supply the power island, including two gas turbines, two heat recovery steam generators, a steam turbine and all the auxiliaries. Initec Enegia will construct the entire plant and install the solar system.


Fuel availability


Duba 1 will be the first ISCC plant to use condensate as a gas turbine fuel when it starts operating in 2017. Condensate, which has properties similar to naphtha, is already used in some of Saudi Arabia’s other gas turbine power plants.


“When we start planning for a project, the available fuel generally dictates how the project is developed. In the north, the fuels available were gas and condensate, so we designed a plant that could generate the maximum power output coupled with the maximum possible efficiency based on the selected fuels,” said Alrashed.


The power plant is being built north of Duba city, at around 140 kilometers from Tabuk Province on the Red Sea Coast, in the north west of the country.


According to Ziyad Alshiha, president and CEO of SEC, this area of Saudi Arabia is a developing region with limited grid interconnection, so the additional power generated by Duba 1 will be important in supporting economic growth.


De-risking the technology


One of the key challenges initially faced by SEC was deciding on the most suitable CSP technology for the ISCC plant. Consequently, the choice was kept open to encourage the participation of various suppliers and create competition, and to enable SEC to evaluate different technologies.


Fresnel, parabolic trough, and tower technology providers all expressed their interest in supplying the CSP unit, including Novatec and Flagsol from Germany, TSK, Abengoa and Elecnor from Spain, and Solar Euromed from France.


Given that the proposals were so varied, SEC met with each company to determine whether the technology being offered could meet their requirements in terms of reliability and availability.


“This is the first project of its kind for SEC so technology selection was always going to be a challenge. All the suppliers were saying ‘we offer the best solution’ but we needed to establish what was of prime importance for SEC – a reliable plant that will operate for 25 years,” asserted Alrashed.


The developer incorporated a long-term service agreement that involves the CSP system supplier throughout the plant’s lifecycle, thereby ensuring that the reliability and availability targets set for the plant would be met.


“We de-risked the technology by setting all the conditions that we thought would fulfil our technical requirements and by involving the solar system designer with a long-term service agreement to be part of the operations and maintenance,” Alrashed said.


“We wanted a supplier who was confident of their technology and saw no risk. We wanted companies that spent a lot of time on development and had a mature and proven solution, all which translates into commercial factors.”


In addition, SEC communicated with various ISCC operators, and the company decided to choose parabolic trough technology on the basis it would provide the maximum output at the lowest levelized cost of electricity (LCOE).


ISCC in series


As construction starts on the Duba 1 plant, work is progressing simultaneously on two other ISCC projects in the kingdom: the 1,390 MW Waad Al Shamal plant with 50 MW CSP and the 3,600 MW Taiba facility with a provision of 180 MW CSP.


In December, GE was awarded a $980-million contract for Waad Al Shamal under which it will deliver the turnkey power plant, supplying four gas turbines, a steam turbine and the solar technology. The project is set to become operational in early 2018.


The Taiba project is in the early stages of bidding and SEC is in the process of purchasing the major equipment. The plant will be completed on a lump-sum turnkey basis within 53 months from the date of the contract.


Building ISCC facilities is clearly the preferred route for SEC when it comes to implementing CSP, allowing the company to gain construction and operation experience without taking significant risks.


“ISCC plants aren’t cheaper than combined cycle plants, but they’re much cheaper than standalone CSP,” Alrashed said.

“Waad Al Shamal and Duba will produce the cheapest CSP worldwide; this is the main driver for SEC.”


By Heba Hashem

Leave your thoughts here

Latest News

See more+
  • What we've known about Indian CSP tender in Q1 2024

    It was reported that India will carry out a round of renewable energy bidding in the first quarter of 2024, which requires bidders to submit a program must contain more than 50% of the CSP capacity. This news got great attention in the past weeks on the possibility of CSP revival in India. But how about the challenges to hinder the development of Indias solar thermal power generation in the past y

  • CSP Project Tenders Last Week (Apr.15-21)

    Procurement and Construction Bidding- Xinhua Hydropower Bozhou 100MW CSP ProjectOn April 17, Xinhua Botai (Bole) Power Investment Co., Ltd. issued a bidding announcement for Xinhua Hydropower Bozhou 100MW CSP+900MW PV Project bid section VII: 100 MW CSP project PC general contracting. Bidding document acquisition time: from April 17, 2023 to April 24, 2023 at 16:00.One step closer towards Australi

  • One step closer towards Australia’s first commercial scale concentrated solar power plant

    On behalf of the Australian Government, the Australian Renewable Energy Agency (ARENA) has announced it has approved $65 million in funding to Vast Solar to construct VS1, a first-of-a-kind 30 MW / 288 MWh concentrated solar power (CSP) plant in Port Augusta, South Australia.ARENA’s funding for VS1 is conditional upon the project reaching financial close, which is targeted to occur in late 2023.

  • CSP Project Tenders Last Week (Apr.8-14)

    EPC Tender- SPIC Shanshan 100MW CSP ProjectOn April 8, SPIC Henan Company issued a public bidding announcement for the EPC general contract of SPIC Shanshan 100MW CSP Project. Application deadline: April 14, 2023, 23:59.Olympic Brewery: Paving the way for beer production by harnessing solar energy, in partnership with AbsoliconAthens, March 4, 2023 - In the framework of its ESG strategy with the k

Reports(Member Only)

See more+
  • CSP Focus Membership Proposals

    We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea

  • The Latest CSP Focus Monthly Update

    Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.

  • CSP Project Monthly Update 2022 December Edition

    CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.

  • Presentations-CSP Focus China 2021

    The Report is for CSP Focus Members only.

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news