Kuwait 50MW Parabolic Trough CSP Project under Shagaya 2GW Renewable Energy Park Phase 1

<BACK

Report Name : Kuwait 50MW Parabolic Trough CSP Project under Shagaya 2GW Renewable Energy Park Phase 1

Reporter/Writer : CSP Focus

Year : May, 2018

Venue :

Conference : CSP Focus MENA 2017 Sept.13-14 Dubai

Outline

  • Kuwait Environment

  • Innovative Renewable Energy Research program (IRE)

  • Shagaya RE Park

  • Three phases of the Shagaya RE Master Plan

  • Phase One-- Shagaya RE Project

  • The 50MW CSP Parabolic Trough Plant

Latest News

See more+
  • Energy storage is key for the future of the concentrated solar power market

    Concentrated solar power (CSP) with energy storage is an upcoming renewable technology that promises to provide cost-effective power generation with improved efficiency.CSP energy storageAlthough the technology has been in existence since the 1980s, growth of CSP was hindered by a number of factors such as high cost of capital, global economic slowdown resulting in lack of finance, competition fro

  • Foresight Italian Green Bond Fund lists a €5.3 million project bond for a greenfield concentrated solar power hybrid plant, CSP Sicilia

    The first CSP technology bond project with Fresnel mirrors that converts solar radiation into thermal energySponsored by Archimede S.r.l. Engineering Company ("Archimede"), the bond, which received green certification, is fully subscribed by the Fund and listed on the ExtraMOT PRO segment of the Italian Stock ExchangeAn innovative hybrid technology that makes it possible to produce energ

  • CSP-PV solar project Noor Midelt I: EDF Renewables consortium wins

    Masen announces the tender for theNoor Midelt I solar project. The Noor Midelt I solar plant is one of theworlds first hybrid power plants (CSP-PV).Masen today announces the award of the international tender for the design,financing, construction, operation and maintenance of the Noor Midelt I projectto the consortium led by EDF Renewables. (France) and composed of Masdar(United Arab Emirates) and

  • Construction progress on MBR Solar Park – Phase 4's 260m solar tower

    PICTURES: The development of Phase 4s solar tower is 7% ahead of schedule, whilst its solar field is 73% completeHE Saeed Mohammed Al Tayer, managing director and chief executive officer of Dubai Electricity and Water Authority (Dewa), has received a construction update on Phase 4 of the Mohammed bin Rashid Al Maktoum Solar Park (MBR Solar Park) project, including its 260m-tall solar tower, in Dub

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news