中文  |  ENGLISH

Applicants in China 2nd Batch of CSP Demonstration Projects (Member Only)

<BACK

Report Name : Applicants in China 2nd Batch of CSP Demonstration Projects (Member Only)

Reporter/Writer : CSP Focus光略咨询

Year : February 13th, 2019

Venue : China

Conference :

Outline

This Report is for CSP Focus Members only. Click "Apply" to join as CSP Focus Member.

Updating--Feb., 2019 Edition

11 pages in total



1.Projects with feasibility study meeting finished (P1-3)

These 24 projects with total capacity of 3,050 MW have been progressed faster with the feasibility study finished during in the past three years, and they are expected to be included in the 2nd batch of China CSP demonstration projects in the future.


2.Projects Applying for China 2nd Batch of CSP Demonstrations (P4-7)

These 57 projects with total capacity of 14,900 MW have been submitted for the application of China future CSP demonstration projects.


3.Projects Located in Hami Applying for China 2nd Batch of CSP Demonstrations (P8-11)

These 19 projects with total capacity of 2,000 MW are located in Hami, a city in China western Xinjiang province, and have been submitted for the application of China future CSP demonstration projects.


Latest News

See more+
  • 2022 Annual Power Generation Exceeding the Design Value -- SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant Sees Another Good Year

    The total annual cumulative actual power generation of the SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant in 2022 was 146.4 GWh, i.e. 100.26% of the designed annual power generation (146GWh), completing yearly target.The plant has been operating in good conditions. As shown in the monthly power generation in Figure 1, it has 124 days seeing a completion of 100% of the designed generation.

  • Dubai’s concentrated solar power project starts supplying electricity to the grid

    On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable

  • Four bidders shortlisted for 200MW solar plant

    The plant, which will use lenses or mirrors to focus a large area of sunlight onto a receiver, is due to be operational by 2027 and is the flagship renewable project in government’s Integrated Resources Plan (IRP) for energy development in the years to 2040.On Tuesday, the Ministry of Minerals and Energy published a shortlist of four bidders who include major global players with thousands of mega

  • CSP Project Tenders Last Week (Nov.14-20)

    Project Construction Supervision Bidding- POWERCHINA Ruoqiang 100MW CSP + 900MW PV ProjectOn Nov. 14, POWERCHINA Renewable Energy Co., Ltd issued a tender announcement for the construction supervision of the POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project. According to the announcement, the owner of POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project is POWERCHINA Ruoqiang Ruida Energy Development C

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news