Located in Hainan Eco Solar Energy Park, 12 kilometers southwest to Gonghe County of Qinghai Province, Power China Gonghe 50MW Molten Salt Tower CSP Project is selected as one of the first batch of pilot CSP projects in China. 


1. Overview (P2)

2. Fast sheet (P2-3)

3. Project Milestones (P4)

4. Project Participants

    4.1. Developer (P5)

    4.2. Owner&Investor (P5)

    4.3. Owner & Investor & EPC Contractor (P5)

    4.4. Solar Field and Receiver - Equipment and Installation (P6)

    4.5. Part of Equipment Suppliers (P7-8)


Latest News

See more+
  • LOINTEK WINS TWO MAJOR CONTRACTS FOR THE WORLD’S BIGGEST SOLAR POWER PLANT

    Design and construction of the steam generation and thermal storage systemsOil to salt heat exchangers in Xina (South Africa)LOINTEK reaffirms its global leadership position with a 70% market share in steam generation and thermal storage systems for thermosolar power. The DEWA IV thermosolar power plant in Dubai generates renewable energy with a capacity of 950 MW, three times greater than any pla

  • Aalborg CSP signs 600 MWe order with Shanghai Electric for no-leaks steam generation systems to Dubai CSP project

    The record-breaking Dubai 700MW CSP+250 MW PV Hybrid Project developed by ACWA POWER, with Shanghai Electric Group Corporation as EPC, will use the Steam Generation Systems based on header-and-coil technology from Aalborg CSP after signature of a 600 MWe order for delivery of 42 heat exchangers and pressure vessels. The header-and-coil technology from Aalborg CSP has operated since 2009 in Spain w

  • China largest parabolic trough CSP plant foresees completion this year

    ChinaCNNC Royal Tech Urad 100MW parabolic trough CSP project in Inner Mongolia is among the 1st batch of 20 pilot CSP projects which were announced last September. Recently,the 1st batch of 1365 high temperature vacuum receiver tubes have been sent from Royal Tech Changzhou factory to the Inner Mongolia CSP plant site. The Changzhou factory is ready for offering receiver tubes both for the Urad 10

  • Application of BCMC Storage & Heat Exchange System in CSP

    CSP is a green form of clean energy. The whole life cycle is environmentally friendly, the energy storage cost is low, the technology is mature, the power output is stable and controllable, and it has peak-shaving capability and can be used as a basic power source.The commercialization of CSP started in Europe and the United States in the 1980s. Since the beginning of the new century, emerging mar

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news