Home > Technology > Solar Field > Here
[Solar Tracking Inclinometer] Wuxi Bewis Sensing Technology LLC
2019.08.05 From: Wuxi Bewis Sensing Technology LLC
Company Name: Wuxi Bewis Sensing Technology LLC
Headquarter: China
TEL: +86510-8573-7178-801
Email: sales@bwsensing.com
Website: https://www.bwsensing.com/
Address: Building 30, No.58 Xiuxi Road, Wuxi City, Jiangsu Province, China
Company& Business Introduction |
CSP Business Category: Solar Field, EPC/Design/Engineering/Construction
Key Product/Service: Solar Tracking Inclinometer
Company and Business Introduction:
As a national high-tech enterprise,Bewis is an excellent inertia sensor supplier,has more than 100 related intellectual property rights. Bewis focused on the field of inertial sensing technology, with hundreds of types of tilt sensor, inclinometer switch, electronic compass, AHRS, inertial measurement unit, optical fiber gyroscope, integrated navigation and so on. Bewis meets all kinds of inertial attitude measurement needs.
After many years of research and development, we have accumulated experience in practice, breakthrough in innovation in technology, and developed a photothermal automatic tracking and controlling tilt sensor for the environment with large temperature difference between day and night and harsh natural environment in northwestern China, and it has been applied in many projects.
Using tilt sensor and mechanical device to realize tracking of the sun. The tilt sensor with small temperature drift, high precision and reliable performance can help the CSP system to get rid of the external conditions such as regional and weather conditions, and improve tracking efficiency. The automatic correction of the angle is realized, and the problem that the accumulated error changes with time is effectively solved. It can be used in collectors such as trough, tower, butterfly and Fresnel.
CSP Project References:
Luneng 50MW tower CSP project
Expected Business Partners:
Cooperation needs: Solar thermal project
Product Details |
Inclinometer application in trough CSP project
The 50MW trough power stasion is national demonstration project, generating 256 million kWh of electricity per year. The static gravity field is converted into a angle change, and the horizontal angle value is directly output by digital means. The product has high long-term stability, small temperature drift,use simplely, and strong resistance to external interference.
Inclinometer application in tower CSP project
Luneng 50MW tower CSP project, equipped with 12-hour molten salt energy storage system, 610000m² mirror area. The inclinometer application uses a high-precision MEMS accelerometer and a high-resolution differential digital-to-analog converter with built-in automatic compensation and filtering algorithms that minimize errors caused by environmental changes.
*PDF Download--Company/Business/Product Brochure:
公司及产品介绍 Company Profile & Product Details.pdf
Business Contact |
If you would like to connect with the company on CSP business, please send the request to CSP Focus staff describing your information and demand, we will revert to you soon with the contact person details.
Email: csp@cspfocus.cn / TEL: +86 21 61110177
More from CSP Focus
Next[Basic and Detail Engineering Services] EMPRESARIOS AGRUPADOS
[Innovations Solar Field/Storage/Power/Applications] Hiro Energy-Tech Ltd.
[Beam -Down CSP plant solution] BCP Solar Technology Co., Ltd.
[EPC, Steam turbine/Gas Turbine/Heat storage]MAN Energy Solutions
[Reflector Manufacturer] Wuhan Sunnpo Solar Technology Co., Ltd.
[EPC, Steam turbine/Gas Turbine/Heat storage]MAN Energy Solutions
Leave your thoughts here
Latest News
See more+-
CSP Project Tenders Last Week (Apr.15-21)
Procurement and Construction Bidding- Xinhua Hydropower Bozhou 100MW CSP ProjectOn April 17, Xinhua Botai (Bole) Power Investment Co., Ltd. issued a bidding announcement for Xinhua Hydropower Bozhou 100MW CSP+900MW PV Project bid section VII: 100 MW CSP project PC general contracting. Bidding document acquisition time: from April 17, 2023 to April 24, 2023 at 16:00.One step closer towards Australi
-
One step closer towards Australia’s first commercial scale concentrated solar power plant
On behalf of the Australian Government, the Australian Renewable Energy Agency (ARENA) has announced it has approved $65 million in funding to Vast Solar to construct VS1, a first-of-a-kind 30 MW / 288 MWh concentrated solar power (CSP) plant in Port Augusta, South Australia.ARENA’s funding for VS1 is conditional upon the project reaching financial close, which is targeted to occur in late 2023.
-
CSP Project Tenders Last Week (Apr.8-14)
EPC Tender- SPIC Shanshan 100MW CSP ProjectOn April 8, SPIC Henan Company issued a public bidding announcement for the EPC general contract of SPIC Shanshan 100MW CSP Project. Application deadline: April 14, 2023, 23:59.Olympic Brewery: Paving the way for beer production by harnessing solar energy, in partnership with AbsoliconAthens, March 4, 2023 - In the framework of its ESG strategy with the k
-
Oman weighs Concentrated Solar Power project at Duqm
A first-of-its-kind Concentrated Solar Power (CSP) project is envisioned for development near Duqm in Al Wusta Governorate as part of Oman’s pivot away from gas-powered electricity generation to renewables-based sources.The initiative, subject to the findings of a feasibility study, will add to a mixed portfolio of renewable resources and technologies being explored by the Oman Power and Water Pr
Reports(Member Only)
See more+-
CSP Focus Membership Proposals
We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea
-
The Latest CSP Focus Monthly Update
Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.
-
CSP Project Monthly Update 2022 December Edition
CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.
-
Presentations-CSP Focus China 2021
The Report is for CSP Focus Members only.
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China
Project Updates
See more+-
Lanzhou Dacheng Dunhuang CSP Project
Asia Pacific-China,Operational,Parabolic Trough
-
Luneng Haixi 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower
-
Dubai 950MW NOOR Energy 1 CSP+PV Project
MENA-UAE,Under construction,Power Tower
-
Power China Gonghe 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower