中文  |  ENGLISH

[Receivers for Trough/Fresnel systems] ShanDong Huiyin Energy Co., Ltd

2019.10.15     From: ShanDong Huiyin Energy Co., Ltd


Company Name: ShanDong Huiyin Energy Co., Ltd

Headquarter: China

TEL: 0631-8966005

Email: info@huiyin-group.com

Website: www.huiyin-group.com

Address: No. 27, Longhai Road, Nanhai Harbor Industrial Zone, Wendeng District, Weihai, Shandong Province, China


Company& Business Introduction


CSP Business Category: Solar Field

Key Product/Service: HCE, Receivers for trough /Fresnel system with HTF/molten salt/DSG, Solar field


Company and Business Introduction: 


In 2008 Huiyin started the production of vacuum receivers for parabolic concentrators. The production of receivers was moved from Beijing to Weihai in 2010. 


Huiyin has produced in its facilities over 600 MW of receivers for commercial power plants around the world, including molten salt project. Huiyin is the only receiver producer that has molten salt tube technology. At the moment Huiyin is supplying to a 1GW project 


Huiyin has strong government partners including the Chinese Ministry of Finance, The China Development Bank, The State Development and Investment Corporation and the Belgium Ministry of Public Enterprises. 


Huiyin bankable superior receivers with outperforming technology are more durable and offer an extended life time and are the first serviceable receivers in the market. 


Huiyin excellence in production, proven high volume capability and ability to develop new products for its clients make it today the preferred CSP receiver supplier of the industry. 


With 10 GW Concentrated Solar Power planned in the 13th 5 year plan. Huiyin is uniquely positioned to take advantage of the fastest growing market in the world. This new challenge will drive development of products, production lines and will drive down cost of CSP even further.


Huiyin with its high performance receivers – which comprise the core of all solar power plants using parabolic trough and linear Fresnel technologies – contributes decisively to making tomorrow’s energy production possible today. We rank as market and technology leader for receiver tubes and have supplied more than 600 MW of receivers to power plants all over the world.


CSP Project References:


  • Areva 125MW Reliance Power Plant

Year: 2012-2013

Capacity:125 Mwe 

Owner:Reliance Power

EPC: Areva Solar

  


  • Skyfuel 33 MW Stillwater project

Year: 2012-2013

Capacity: 33 MW

Owner:ENEL Green Energy

EPC: Skyfuel

  


  • Aalborg 16.6MW Brønderslev project in Denmark

Year: 2014

Owner:16.6 MW

EPC: Aalborg CSP

   


  • EOR project in Middle East

Year: 2016-2018

Capacity: 1 GW

   


  • Two heating projects in Oostende and Antwerp, Belgium 

Year: 2019

   


  • Huaqiang Zhangbei 50MW demonstration project in Zhangbei

Year: 2016-2018

Capacity: 50 MW


  • Inner Mongolia 100,000 m2 heating project

Year: 2017

Aperture area: 100,000 m2


  • Valle 1, Valle 2 projects in Spain

Year: 2014

Capacity: 50 MW each

EPC: Torresol Energy (Joint Venture company of SENER and Masdar)

   


  • Areva 5MW TEP Tucson project

Year:2013

Capacity: 5MW

EPC: Areva Solar

Region:US

   


  • Molen Salt project in Akesai, Qinghai province

Year: 2017

Owner:Tianjin Binhai CSP

EPC: Tianjin Binhai CSP


  • Molten salt project in Spain

Year: 2015

EPC: Novatec


  • Abengoa Sanlucar project

Year: 2010

Capacity: 50 MW

EPC:   Abengoa 

 

  • SEGS 9 Ultimate Trough project

Capacity:80MW

Owner:NextEra

Developer:Luz


  • La Dehesa project in Spain

Year: 2013

Capacity:  50 MW

EPC:   SAMCA Renovables


  • Sewage treatment plant in Delingha

Year: 2010

Aperture Area:  10 collectors

EPC:   Chengdu Boyu Energy


  • Boyu's facility project in Delingha

Year: 2014

Aperture Area:  48 collectors

EPC:   Chengdu Boyu Energy


Expected Business Partners: 


  • Power plant owner, EPC

  • Industrial heating users


Product Details


HTF Receivers



  • Hydrogen solution

  • High performance and stable selective coating

  • Self-cleaning AR coating

  • Robust glass-metal seal

  • Air stable coating

  • Stainless steel and carbon steel receivers

  • Up to 5m long

  • Pass 700MW DEWA qualification




Molten salt receivers



  • Hydrogen solution

  • High performance and stable selective coating

  • Self-cleaning AR coating

  • Robust glass-metal seal

  • Air stable coating

  • Stainless steel and carbon steel receivers

  • Up to 5m long

  • References: up to 590 degree




Receivers for trough /Fresnel system



  • Hydrogen solution

  • High performance and stable selective coating

  • Self-cleaning AR coating

  • Robust glass-metal seal

  • Air stable coating

  • Stainless steel and carbon steel receivers

  • Up to 5m long


Business Contact


If you would like to connect with the company on CSP business, please send the request to CSP Focus staff describing your information and demand, we will revert to you soon with the contact person details.


Email: csp@cspfocus.cn / TEL: +86 21 61110177



Leave your thoughts here

Latest News

See more+
  • What we've known about Indian CSP tender in Q1 2024

    It was reported that India will carry out a round of renewable energy bidding in the first quarter of 2024, which requires bidders to submit a program must contain more than 50% of the CSP capacity. This news got great attention in the past weeks on the possibility of CSP revival in India. But how about the challenges to hinder the development of Indias solar thermal power generation in the past y

  • CSP Project Tenders Last Week (Apr.15-21)

    Procurement and Construction Bidding- Xinhua Hydropower Bozhou 100MW CSP ProjectOn April 17, Xinhua Botai (Bole) Power Investment Co., Ltd. issued a bidding announcement for Xinhua Hydropower Bozhou 100MW CSP+900MW PV Project bid section VII: 100 MW CSP project PC general contracting. Bidding document acquisition time: from April 17, 2023 to April 24, 2023 at 16:00.One step closer towards Australi

  • One step closer towards Australia’s first commercial scale concentrated solar power plant

    On behalf of the Australian Government, the Australian Renewable Energy Agency (ARENA) has announced it has approved $65 million in funding to Vast Solar to construct VS1, a first-of-a-kind 30 MW / 288 MWh concentrated solar power (CSP) plant in Port Augusta, South Australia.ARENA’s funding for VS1 is conditional upon the project reaching financial close, which is targeted to occur in late 2023.

  • CSP Project Tenders Last Week (Apr.8-14)

    EPC Tender- SPIC Shanshan 100MW CSP ProjectOn April 8, SPIC Henan Company issued a public bidding announcement for the EPC general contract of SPIC Shanshan 100MW CSP Project. Application deadline: April 14, 2023, 23:59.Olympic Brewery: Paving the way for beer production by harnessing solar energy, in partnership with AbsoliconAthens, March 4, 2023 - In the framework of its ESG strategy with the k

Reports(Member Only)

See more+
  • CSP Focus Membership Proposals

    We are now proposing CSP Focus Membership, hoping to better serve our members to keep pace with the latest updates of ongoing CSP projects worldwide, and to establish and maintain business relations with major shareholders of the projects. CSP Focus offers to Membership exclusive access to:1. Daily/Weekly update and analysis on CSP policies, projects, technologies, market trend and corporate relea

  • The Latest CSP Focus Monthly Update

    Join CSP Focus Membership to Get the Latest CSP Focus Monthly Update December Edition.

  • CSP Project Monthly Update 2022 December Edition

    CSP Focus is presenting CSP Project (China) Update 2022 December Edition.Detail report is available for CSP Focus Membership.

  • Presentations-CSP Focus China 2021

    The Report is for CSP Focus Members only.

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news