[Thermography Solutions for Solar Power Tower Check] InfraTec GmbH Infrarotsensorik und Messtechnik

2020.01.21     From: InfraTec GmbH Infrarotsensorik und Messtechnik

Company Name: InfraTec GmbH Infrarotsensorik und Messtechnik

Headquarter: Dresden

Tel: +49 (0) 351 82876 610 

Email: thermo@InfraTec.de

Website: www.InfraTec.eu

Address: Gostritzer Straße 61 – 63, 01217 Dresden / Germany


Company & Business Introduction


CSP Business Category: Commissioning/O&M, 3rd Party Services

Key Product/Service: Thermography Solutions for Solar Power Tower Check


Company and Business Introduction:


The Dresden-based company InfraTec GmbH Infrarotsensorik und Messtechnik is a specialist for products and services in the field of infrared technology. It is active in all areas of thermographic applications, with its scope of performance ranging from the sales of thermographic cameras to the supply of thermal imaging systems and turn-key thermographic automation solutions. One of these solutions regarding concentrated solar power (CSP) is the Solar Power Tower Check (SPTC). This fully automated system uses infrared technology to monitor the central absorber of a solar tower power plant.


It enables to reduce maintenance costs and to prevent cost-intensive downtimes due to overheating. The turnkey solution for monitoring incorporates HD thermography cameras and optimised tele lenses, which guarantee long-term precise and reliable temperature measurements via long distance. This optimised system for commissioning and regular operation of CSP solar power tower plants is delivered and integrated worldwide.


InfraTec was founded in 1991 and, with its own capacities in manufacturing and development, employs about 230 staff now. For nearly 30 years, the company has been supplying thermal imaging technology to demanding customers in the energy industry. 


CSP Project References:


  • Cerro Dominador Solar Power Plant

  • (Molten Salt Tower) Atacama Desert Chile

  • Luneng Haixi Solar Power Plant

  • (Molten Salt Tower) China


Expected Business Partners:


Project Developers and EPC’s


Product Details


Solar Power Tower Check



Thermography-based Solar Power Tower Monitoring System



* PDF Download--Company/Business/Product Brochure


InfraTec-SPTC-h-EN-mail.pdf


Business Contact


If you would like to connect with the company on CSP business, please send the request to CSP Focus staff describing your information and demand, we will revert to you soon with the contact person details.


Email: csp@cspfocus.cn




Own your CSP business page on CSP Focus website and LinkedIn platforms? 


Just Click here to free create: CSP Focus Company Catalog Application Form & Instruction


Leave your thoughts here

Latest News

See more+
  • 2022 Annual Power Generation Exceeding the Design Value -- SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant Sees Another Good Year

    The total annual cumulative actual power generation of the SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant in 2022 was 146.4 GWh, i.e. 100.26% of the designed annual power generation (146GWh), completing yearly target.The plant has been operating in good conditions. As shown in the monthly power generation in Figure 1, it has 124 days seeing a completion of 100% of the designed generation.

  • Dubai’s concentrated solar power project starts supplying electricity to the grid

    On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable

  • Four bidders shortlisted for 200MW solar plant

    The plant, which will use lenses or mirrors to focus a large area of sunlight onto a receiver, is due to be operational by 2027 and is the flagship renewable project in government’s Integrated Resources Plan (IRP) for energy development in the years to 2040.On Tuesday, the Ministry of Minerals and Energy published a shortlist of four bidders who include major global players with thousands of mega

  • CSP Project Tenders Last Week (Nov.14-20)

    Project Construction Supervision Bidding- POWERCHINA Ruoqiang 100MW CSP + 900MW PV ProjectOn Nov. 14, POWERCHINA Renewable Energy Co., Ltd issued a tender announcement for the construction supervision of the POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project. According to the announcement, the owner of POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project is POWERCHINA Ruoqiang Ruida Energy Development C

Reports(Member Only)

See more+

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news