中文  |  ENGLISH

Industry Report

       


CSP Focus, upon customers’ request, can offer CSP market reports on global key areas, and analysis reports on different industry segmentations.

Latest News

See more+
  • CPECC Hami Tower CSP Project progressed well with installation, to be completed in Mid 2019

    Enlisted in China CSP Pilot Projects, CPECC Hami 50MW molten salt tower CSP project has been progressed well and the project installation work had been fully started last month in November after the structure of the 180m receiver tower was completed in late October.

  • Noor Midelt : Phase 1

    This phase will include two hybrid power plants, combining CSP (solar thermal) and PV (photovoltaic).According to our information, the project will cover 825 MW (300 MW in CSP and 525 in PV) with storage, for an investment estimated at 2.1 billion dollars (20 billion DH) and an integration rate of more than 35 %.noor midelt : phase 1“The award will be for two separate contracts for each of the tw

  • Capacity building to unlock private finance for green energies in MENA unveiled

    The Renewables Academy AG (RENAC), an international training provider for green energy technologies, announced the start of the scholarship application phase for one of the trainings under its 18-month program “Green Banking MENA - Capacity Building on Green Energy and Climate Finance”. The program comprises a total of three training courses, a Train-the-Trainer seminar, an Applying Green Energy

  • CONTOURGLOBAL SELLS 49% STAKE OF ITS SPANISH CSP ASSETS FOR EUR 134M

    ContourGlobal is reportedly selling 49 percent stake of company’s 250 MW Concentrated Solar Power (CSP) plants in South-West Spain, which they bought from Acciona SA in early 2018.As per the agreement, ContourGlobal will sell 49 percent stake in the Concentrated Solar Power (CSP) Portfolio to Credit Suisse Energy Infrastructure Partners (CSEIP). The selling price of the shares is to be paid in ca

Free Reports

See more+
  • CPECC Hami 50MW Tower CSP Project

    Enlisted in China CSP Pilot Projects, CPECC Hami 50MW Tower CSP Project was located in Hami, Xinjiang. With planned capacity 2*50MW, the phase one of 50MW will use molten salt tower technology, and the construction period was estimated to be 21 months.

  • Shouhang Dunhuang 100MW Molten Salt Tower CSP Plant

    1. Project Overview2. Technology &DesignShouhang Molten Salt Tower Technologyand EquipmentHeliostatReceiverHeat storage devices3. Project developerand investor3.1 Major involved projects and business3.2 Project investment 4. Project development and progress5. Main Participants6. Shouhang CSP plant development experience6.1 Shouhang Dunhuang 10MW Molten Salt Tower CSP Project6.2 Shouhang Dunhua

  • China 1st Batch of CSP Pilot Projects Update

    Nov-2018 Edition Part 1: Background and Fact Sheet(P1) 1.1 Technologies of China CSP Pilot Projects (P2) Chart 1: Technologies of China CSP Pilot Projects (P3) 1.2 Locations of China CSP Pilot Projects (P5) Chart 2: Locations of China CSP Pilot Projects (P6) 1.3 Ownership of China CSP Pilot Projects (P7) Chart 3: Ownership of China CSP Pilot Projects (P8) 1.4 Developer, EPC Contractor and Technology Provider (P9) Chart 4: Developer, EPC Contractor and Technology Provider of China CSP Pilot Projects (P10)

  • Suppliers List of China Key CSP Projects (Updating)

    13 key concentrated solar power projects in China undergoing:Shouhang Dunhuang 100MW Molten Salt Parabolic Trough ProjectRoyal Tech Yumen 50MW Parabolic Trough ProjectDCTC Dunhuang 50MW MS CLFR ProjectRayspower Yumen 50MW Trough ProjectCNNC Royal Tech Urad 100MW Parabolic Trough ProjectSupcon Delingha 50MW Molten Salt Tower ProjectLuNeng Haixi 50 MW Solar Thermal Tower Plant ProjectPower C

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news