As one of the first batch of 20 pilot CSP projects, CSNP Royal Tech Urat 100MW Parabolic Trough CSP Project is the largest trough plant within the pilot projects, in terms of installed capacity.
1. Overview (P2)
2. Fast sheet (P2-3)
3. Highlights (P3)
4. Project Milestones (P4)
5. Project Participants
5.1. Developer--Inner Mongolia China Nuclear Royal Tech Co., Ltd (P5)
5.2. Investor & EPC--China Shipbuilding New Power Co., Ltd. (abbr. CSNP) (P5)
5.3. Owner & Investor--China Nuclear (Nanjing) Energy Development Co., Ltd (P6)
5.4. Owner & Investor--Royal Tech CSP Limited (P6)
5.5. Part of Equipment Suppliers (P7-8)
More from CSP Focus
NextSystem Integration and Digitalization Practice in Power China Gonghe 50MW Tower CSP Project
Plant Performance of Cerro Dominador and Chile CSP Potential
Introduction of Dubai 950MW CSP+PV Project by Shanghai Electric (Member Only)
The Opportunities of Overseas CSP New Projects for Chinese Companies
Yumen Xinneng 50MW Molten Salt Tower CSP Project (Member Only)
Latest News
See more+-
158 GWh – Annual Generation of SUPCON Delingha 50MW Tower CSP Project Released
The operational data of SUPCON Delingha 50MW Tower CSP Project arrived as expected. From August 6, 2021 (after the completion of the turbine rectification) to August 5, 2022, the cumulative actual power generation of the plant for the complete year was 158 GWh, reaching 108% of the annual design power generation (146 GWh) and setting the highest operational record of the same type of power plant i
-
CSP Projects Updates – First Week of August (8.1-8.7)
Feasibility Study Bidding for SPIC Hami 1GW CSP+PV Project Xinjiang Energy & Chemical Co., Ltd. of State Power Investment Corporation (SPIC) invited public bids for the feasibility study of SPIC Hami 1GW CSP+PV Project, which includes 100MW of CSP and 900MW of PV. RFQ for Datang Shichengzi 1GW CSP+PV Demonstration Project Datang Hami Wind Power Development Co., Ltd. released a procurement anno
-
RayGen connects concentrated solar power towers to the grid, but storage component will have to wait
A Melbourne-based solar storage technology company hoping to combine solar power and long duration energy storage (LDES) has announced that one component of its flagship site in Western Victoria isnow connected to the grid.RayGen – backed by AGL and a host of big international energy companies – said on Wednesday that it is sending power to the grid from its Carwarp site just over 30 kilometres
-
Heliogen and Dimensional Energy Announce First-of-its-Kind Collaboration to Produce Carbon-Free Sustainable Aviation Fuel from Concentrated Sunlight and Green Hydrogen
Initiative to demonstrate technology and produce jet fuel reserves for commercially viable carbon neutral flight.Heliogen, Inc. (NYSE: HLGN), a leading provider of AI-enabled concentrated solar energy technology, today announced it has entered into a letter of intent (“LOI”) with Dimensional Energy, a sustainable fuels company, to jointly produce sustainable aviation fuel (“SAF”) at Heliogen’
Upcoming Events
See more+-
12th CSP Focus China 2022
2022.04.21-22 Beijing
-
11th CSP Focus China 2021
2021.10.28-29 Beijing
-
10th CSP Focus China 2020
2020.10.22-23 Beijing, China
Project Updates
See more+-
Lanzhou Dacheng Dunhuang CSP Project
Asia Pacific-China,Operational,Parabolic Trough
-
Luneng Haixi 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower
-
Dubai 950MW NOOR Energy 1 CSP+PV Project
MENA-UAE,Under construction,Power Tower
-
Power China Gonghe 50MW Molten Salt Tower CSP Project
Asia Pacific-China,Operational,Power Tower