Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

<BACK

Report Name : Construction and Operation of SUPCON SOLAR Delingha 50MW Tower CSP Project

Reporter/Writer : Jin Jianxiang, SUPCONSOLAR

Year : Oct 24, 2019

Venue : Beijing, China

Conference : CSP Focus Innovation 2019 (Oct. 24-25, Beijing)

Outline

40 pages in total


Part 1: SUPCON Solar

Part 2: Construction of Delingha 50MW Tower CSP Project 

  • R&D Process (P7)

  • Delingha 50MW Profile (P8)

  • Construction Process (P9)

  • Project Site (P10-17)

Part 3: Operation of Delingha 50MW Tower CSP Project (P18-30)

  • Typical Sunny and Cloudy Days Performance (P20-21)

  • Continuous electricity generation of 2.5GWh (P22)

  • Load limitation impact on CSP and PV (P25-26)

  • Electricity generation (P27-28)

  • Observed performance against design value (P29)

  • Actual performance/Design parameters (P30)

Part 4: Issues during Commissioning and Operation

  • Issues during Commissioning and Operation (P30-37)

  • Experience and summary (P38)

  • Anticipation for next stage (P39)

Latest News

See more+
  • 10th Annual CSP Focus China 2020 rescheduled on Oct 22-23 in Beijing, real-time online conference available

    10thAnnual CSP Focus China 2020 was postponed to Oct 22-23 in Beijing China, around30 speakers and 200 participants will attend this grand gathering. Andreal-time online conference will be available to those registered delegates whoare not able to join due to travel constraint. Thisconference will highlight:Performance analysis of operating CSP plants in China - 8 plants, 500MW in total;How to res

  • Xavier Lara on How Spain’s Q4 Auction Can Achieve the 5 GW of CSP it Wants

    Ultimate Trough CSP from schlaich bergermann partner sonne GmbH (SBPS) in Dubai(IMAGE@ SBPS)Spain’s National Energy and Climate Plan, the PNIEC (Plan Nacional de Industria, Energia y Clima) includes a desired 5 GW of CSP added to its existing 2.3 GW, with 2.5 GW in a first tranche from 2021 to 2025 and a second 2.5 GW from 2026 to 2027.But what are the policies needed to make this actually happen

  • Sener sells three Concentrated Solar Power plants in Seville and Cádiz to the Qualitas fund

    Q-Energy, the energy investment vehicle of Qualitas Equity (former Fotowatio investor), has bought from Sener and Masdar -subsidiary of Mubadala- the Concentrated Solar Power Torresol Energy Investments S.A. (“Torresol Energy”), owner of three solar thermal plants in Spain with a total capacity of 120 MW located in Seville and Cádiz. The transaction also includes the operating company of th

  • HelioControl Project Completed: Determination and control of aim points for heliostat fields in operation

    Among solar thermal power plants, solar tower systems are considered to have the greatest potential in terms of efficiency and cost reduction. In particular, costs can be saved on mirrors (heliostats), which account for between 30 and 40 percent of the investment. Frequent calibration or control of the heliostat aim points is one approach. In the HelioControl project, the Fraunhofer Institute for

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:+86-21-6111 0177

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news