中文  |  ENGLISH

[Trough technology/System integration/mirror] Sundhy (Chengdu) Solar Power Co.,Ltd

2019.07.26     From: Sundhy (Chengdu) Solar Power Co.,Ltd

Company Name: Sundhy(Chengdu) Solar Power Co.,Ltd

Headquarter: China

TEL: 028-69921868

Email: guo1473@rayspower.com 

Website: www.sundhy.com

Address: No.118,Muyu Road, Gongxing Town, Shuangliu County, Chengdu, Sichuan, China


Company& Business Introduction


CSP Business Category: EPC/Design/Engineering/Construction; SolarField

Key Product/Service: Parabolic trough system technology, design, engineering, construction side, mirror manufacturer


Company and Business Introduction: 


Sundhy (Chengdu) Solar Power Co.,Ltd. is positioned as a professional solar photothermal power collector system integrator, concentrator mirror equipment manufacturer and solution provider of industrial steam heating system.


CSP Project References:


  • The Electrical Engineering Research Institute of Chinese Academy of Sciences 863 Program 1MW Trough Photothermal Power Generation Demonstration Project Collector System Integration, Trough Reflector Products Supply

  • Construction of 100 MW trough-type heat collector system and supply of trough-type mirror products in Wulat Central Banner, Inner Mongolia


Expected Business Partners: 


Raw Material Purchasing:

  • Raw materials for mirror manufacturing: ultrawhite float glass, silver nitrate, coatings and other raw materials and auxiliary materials;

  • Trough collector bracket, collector tube, tracking drive, control system, etc.


Business cooperation:

  • Project owner/developer

  • Project EPC, etc.


Product Details


Parabolic trough mirror


   





Parabolic trough collector system



Sundhy chengdu RZC50 parabolic trough collector assembly (SCA) has a total length of about 50m, including 8 collector units (SCE), 1 set of drive columns, 8 sets of support columns, and a reducer drive system. Ground Control System (LOC) and associated instruments.


Each collector unit (SCE) consists of a steel frame support supporting 2 rows and 4 columns of 8 RC4 mirrors and three collector tubes. The focal length of the parabolic mirror is 850mm, the length of a single heat collecting tube is about 2040mm, and the outer diameter of the stainless steel heat absorbing tube is about 40mm.


Each reducer drive system consists of a motor drive system that is tracked with the Local Control System (LOC) Control Collector Set (SCA).


A temperature sensor is placed on the collector assembly (SCA). The end of the collector assembly (SCA) is connected to the fixed pipe by a metal hose and is insulated.




Installation, hoisting and construction service of parabolic trough collector



Inversion, installation,leveling, cold debugging of collector circuit, hot debugging of collector, etc.




*PDF Download--Company/Business/Product Brochure: 


Sundhy chengdu Product introduction (20190313).pdf


Business Contact


If you would like to connect with the company on CSP business, please send the request to CSP Focus staff describing your information and demand, we will revert to you soon with the contact person details.


Email: csp@cspfocus.cn / TEL: +86 21 61110177



Leave your thoughts here

Latest News

See more+
  • 2022 Annual Power Generation Exceeding the Design Value -- SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant Sees Another Good Year

    The total annual cumulative actual power generation of the SUPCON SOLAR Delingha 50MW Molten Salt Tower CSP Plant in 2022 was 146.4 GWh, i.e. 100.26% of the designed annual power generation (146GWh), completing yearly target.The plant has been operating in good conditions. As shown in the monthly power generation in Figure 1, it has 124 days seeing a completion of 100% of the designed generation.

  • Dubai’s concentrated solar power project starts supplying electricity to the grid

    On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. The facility is already delivering top-notch technical parameters and reliable

  • Four bidders shortlisted for 200MW solar plant

    The plant, which will use lenses or mirrors to focus a large area of sunlight onto a receiver, is due to be operational by 2027 and is the flagship renewable project in government’s Integrated Resources Plan (IRP) for energy development in the years to 2040.On Tuesday, the Ministry of Minerals and Energy published a shortlist of four bidders who include major global players with thousands of mega

  • CSP Project Tenders Last Week (Nov.14-20)

    Project Construction Supervision Bidding- POWERCHINA Ruoqiang 100MW CSP + 900MW PV ProjectOn Nov. 14, POWERCHINA Renewable Energy Co., Ltd issued a tender announcement for the construction supervision of the POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project. According to the announcement, the owner of POWERCHINA Ruoqiang 100MW CSP + 900MW PV Project is POWERCHINA Ruoqiang Ruida Energy Development C

Reports(Member Only)

See more+

Upcoming Events

See more+

Project Updates

See more+

CONTACT US

Tex:

Email:csp@cspfocus.cn


备案/许可证编号为:沪ICP备17051021号

Wechat public platform

Follow CSP Focus for more news